How to use it
- Choose New BOM and pick the product it makes.
- Set the batch size: the quantities you enter make this many.
- Add the components with their scrap %, any by-products and the routing steps.
- Choose Save BOM. The first BOM of a product becomes its default.
Screen
Bill of materials list
Every BOM with the product it makes, its version, its batch size, how many lines it has and whether it is the default.
How to use it
- Search by BOM number or product.
- Choose Active or Archived under Status.
- Open a BOM to see its recipe and cost, or choose New BOM.
Screen
New or edit bill of materials
The form for a recipe: the product it makes, the batch size, the components with their scrap %, by-products, and the routing steps with setup and run minutes.
How to use it
- Choose the product under Makes and enter the batch size.
- Under Components, add each component, its quantity for one batch and its scrap %.
- Under By-products, add anything useful the process also gives, such as offcuts you can sell.
- Under Routing, add each step with its work centre, setup minutes (once per order) and run minutes (per batch).
- Choose Save BOM.
Questions
- What does scrap % do?
- It adds the share you expect to lose. A component of 10 with 10% scrap is planned and issued as 11 for each batch.
- How are by-products valued?
- At their average stock cost, else their cost price. They go into stock at that value, and the same amount is taken off the cost of the finished goods.
Screen
Bill of materials page
One BOM: its recipe, its routing, and an explosion of every level with the cost of making any quantity, from materials, operations and by-product credit.
How to use it
- Type a quantity in Explosion and cost roll-up to see what that many need and cost.
- Choose Make default so new production orders use this version.
- Choose New production order to make the product from this BOM.
- Choose Archive when the recipe is no longer used, or Delete if nothing has used it.
Questions
- Where do the component costs come from?
- Each component is valued at its average stock cost, else its cost price. A sub-assembly is costed from its own BOM.
Connected to
- Production orders
A production order copies the BOM when it is created, so later changes to the BOM do not change it.
- Work centres
Routing steps run at work centres, and their cost per hour is added to the cost of what you make.
- Material planning
Material planning follows the BOM down every level to work out which components to buy or make.
- Job work
Job work can take the materials to send to a subcontractor from the BOM.
- Directory
The product you make and its components are products in the Directory.
Part of these processes
- From recipe to finished goods
- Bill of materials
- Material planning
- Production order
- Release and issue
- Output
- Inspection
- Close
Questions
- How do I change a recipe without affecting orders already made?
- Edit the BOM, or create a new BOM for the same product: it becomes the next version. Production orders keep the copy of the BOM they were created with.
- Can a component have its own BOM?
- Yes. A component with its own default BOM is a sub-assembly. It is made with its own production order, and material planning suggests one when it is needed.
- Why can’t I delete a BOM?
- A BOM already used by a production order or job work can only be archived, so the history stays true. Archived BOMs can be restored.
- The BOM will not save because it uses its own product.
- A product cannot be its own component, directly or through a sub-assembly. Remove the component that leads back to it.
Words used here
- Bill of materials
- The recipe for a product you make: its components and quantities, the scrap expected, by-products and the steps at work centres.
- Routing
- The steps of a recipe in order, each at a work centre with its setup and run minutes.
- By-product
- Something useful a process also gives, such as offcuts. It goes into stock and its value is taken off the cost of the main product.
- Scrap
- Material or units lost in production. A scrap % on a component plans for the loss; scrapped units carry no value of their own.